Our process

How a Braven solar project works, step by step.

Roughly 90 days from signed contract to a working system, once design, permits and ComEd interconnection are through. Those three are controlled by other people, and we will tell you where yours is sitting at any point.

Racking rails on flashed mounts, conduit and a junction box on a shingle roof, mid-installation

Six steps

What happens, in order.

  1. Send the basics.

    Address, bill, and what you're trying to solve.

  2. Roof and usage check.

    We look at orientation, shading, roof condition and your actual consumption. If it's not a fit, this is where you find out.

  3. Proposal.

    System design, production estimate, the full price, and every incentive shown as an estimate with its assumptions attached.

  4. Permits and interconnection.

    We file with your municipality and with ComEd. This is the slow part and it is mostly out of our hands.

  5. Install and inspection.

    Typically one to three days on site.

  6. Energization and handover.

    Monitoring set up, documents handed over, and a number to call that still works in five years.

Who controls the timeline

Where the 90 days go.

Three of the seven stages sit with other people. Those are the ones that stretch a project, and they are the ones we will tell you about first.

Who controls each stage of a Braven project
StageWho controls itWhat to expect
Roof and usage checkBravenIf it's not a fit, this is where you find out.
ProposalBravenThe full price, with every incentive shown as an estimate and its assumptions attached.
Design and engineeringOutside engineersWe review the drawings and send them back if something is wrong.
PermitsYour municipalityWe file. They schedule the review.
InterconnectionComEdThe slow part. We file and follow up; the utility sets the date.
Install and inspectionBraven, then the municipal inspectorTypically one to three days on site.
Energization and handoverComEd releases; Braven commissionsMonitoring set up, documents handed over.

Payment

Half at signing, half when the work is substantially complete.

Most of our customers pay cash; a HELOC is the usual route for those who finance. We do not lease, and we do not sell power purchase agreements.

Tell us what you need.

Whether that's a quote, a second opinion on someone else's quote, or a system that stopped working, you'll get a straight answer and a real next step.

Or call(815) 443-3155Monday to Friday, 8am to 5pm

Tell us what you need

A recent bill lets us give you real numbers instead of a range. If the upload doesn't take, have it ready for the first call.

Tell us what's going on. If solar doesn't suit your roof we'll say so on the first call.

Call (815) 443-3155Get a Quote